Fixtures and yellow components on assembly line

Inside the Shop

Where precision goes to work.

From the first tool to the final shipment. A closer look at the work behind your part.

Yellow Husky injection molding press at Gavco Plastics

01 / Shop tour

The press floor

18 injection molding machines operate 24 hours a day, seven days a week. Gavco produces parts from 1 gram to 12 pounds.

  • —18 presses
  • —85–880 tons
  • —24/7 production
CNC spindle machining metal tooling

02 / Shop tour

Tool care. Every day.

With 4 to 7 mold changes per day, each mold goes to the tool shop for inspection and preparation for storage or its next run. Every tool receives rust-preventive treatment after each run.

  • —4–7 mold changes per day
  • —Daily preventive maintenance
  • —Date code, revision & insert changes
Technician measuring a component with a caliper

03 / Shop tour

Quality at every stage

Engineering works hand-in-hand with the Quality Department on customer-specific testing to determine a part’s durability limits.

  • —First Article Inspection
  • —Material traceability
  • —Customer-specific testing
Worker screen printing

04 / Shop tour

Beyond the molded part

Gavco’s Assembly Plant performs silk-screen printing, pad printing and product assembly.

  • —Silk-screen printing
  • —Pad printing
  • —Product assembly
Warehouse team preparing packages

05 / Shop tour

Ready for the road

Custom packaging and global shipping complete the project, with Gavco’s own local transportation.

  • —Custom packaging
  • —Global shipping
  • —Own local transportation

Let’s make it happen

Your next part starts here.

Tooling, molding, finishing and shipping. Tell us what your project needs.